LARGE PROJECTS REALISED DURING 2007 – 2014 YEARS

 

Place Year Works Performed
SUNINTERBREWc.Kharkov, Ukraine

2007

Equipment and pipelines installationWiringInstallation of СО2 — UNION

 

InBev Roganc.Kharkov, Ukraine

2008

Equipment and technological pipelines installationWiringCommissioning works:

Bottle line 100 000 b/h — KRONES

 

Yessentuki Mineral Water Plant, c.Yessentuki, Russia

2008

РЕТ beverage line relocation from the village Okulovka in Novgorod region to Yessentuki cityInstallationsTransportation

Wiring

Piping

Purchasing of additional equipment

Commissioning works:

Beverage line software

 

BALTIKA «Slavutich»c.Kiev, Ukraine

2008

Equipment and technological pipelines installationWiringCommissioning works:

Bottle line 50 000 b/h — KRONES

 

 

 

InBev  «Yantar»c.Nikolayev, Ukraine

2008

Equipment and technological pipelines installationWiringCommissioning works:

Bottle line 60 000 b/h — KRONES

 

SARMATc.Donetsk, Ukraine

2009

Equipment and technological pipelines installationWiringCommissioning works:

Packaging equipment — KRONES

 

Company “UrozhayMoscow region  c.Reutov, Russia

2009

Installation of glass bottle line for vodkaTechnological pipelines installationElectric fitting works

 

Coca Cola,»Kvass Beverages»ТМ «Yarylo», c.Zaporizzia, Ukraine

2009

Installation of PET line for kvassTechnological pipelines installationElectric fitting works

Beverage line «Sidel»

c.Ashkhabad, Turkmenistan

2010

Equipment installation at СО2 producing complete plantElectric fitting worksMechanic fitting works

Pipelines

СО2 producing complete plant – UNION

 

«Stepan Rasin Brewery»c.St.Petersburg, Russia

 

2010

Beverage line relocation from the Stepan Rasin brewery in St.Petersburg to the brewery “Volga” HEINEKEN,  city of Nizhniy NovgorodDismantlingPackaging

Transportation

Installations

Commissioning works

 

Autoframosc.Moscow, Russia

 

2010-2011

Renovation of transporters 

 

«Baltic Milk» — affiliate of OJSC “Wimm-Bill-Dann”c.St.Petersburg, Russia

2011

Equipment and technological pipelines installationWiringCommissioning works for PET beverage line — KRONES

 

ImBevc.Santo-Domingo,Dominican Republic

2011

Dismantling of 2 PET beverage lines and of 3 PET storage silosTransportation to the new plantInstallation and commissioning works of 2 beverage lines and 2 silos

Pipelines installation

 

Poultry factory CJSC “Kursk Agroholding»vil. BlagodarnyiStavropol region, Russia

2011

Electric fitting worksCooler-compressor production and production hallsRefrigerator
MinalbaSan-Paolo

2011

Beverage line for mineral waterMechanic and electric fitting works 

 

AmBevGuarulhos

2011

Beer line 60.000 b/hMechanic and electric fitting works 
AmBevSanto – Domingo

2011

Dismantling, transportation and installation of 2 beverage lines to the new plant AmBevMechanic and electric fitting works and pipelines 
OJSC «Wimm-Bill-Dann»

c.Moscow, Russia

 

2012

Installation of the complete line for kefir production (infant food, manufacturer «BRINOX»)Rigging works

Mechanic and electric fitting works

Participation in commissioning works

«REHAU Production» Ltdc.Gzhel, Russia

2012

Technological equipment installationMechanic and electric fitting works and pipelines 
«SARMAT»c.Donetsk, Ukraine

 

2012

Upgrading of the KRONES beverage line
«МPK» Ltd – Maikop brewery

c.Maikop, Russia

 

2012

Installation of the beer PET lineFitting of the mainlines till the new beverage hall building

Erection of the beverage line machinery lifting platform up to the level of 6000 мм

«МPK» Ltd – Maikop breweryc.Maikop, Russia

 

2012

Dismantling of the production compressor  «Ateliers Francois»Installation of the new compressor «Ateliers Francois»
Pharmaceutical factory “KRKA-RUSc.Istra, Russia

 

2012

Integrated installation of technological equipment and pipelines for pharmacological production
«PepsiCo/” ПепсиКо/ Wimm-Bill-Dann/Lianosovo»c.Moscow

2012

Integrated installation of the beverage line SFEquipment installationElectric fitting works and pipelines

 

OJSC «Yadrinmilk”

c.Yadrin

Chuvashiya Republic, Russia

2012-2013

Integrated installation of the milk plant 200 tn/day, including KRONES line, boiler room, compressor room, processing room etc.Equipment installation

Electric fitting works and pipelines

 

Ltd “Automobile factory “GAS”c.Nizhniy Novgorod, Russia

 

2013

Electric fitting worksTransportation at the site as well as installation of materials and equipment supplied by «EISENMANN»

Installation of all control elements

Final paperwork

Pharmaceutical factory “KRKA-RUSc.Istra, Russia

 

 

2013

Installation of pipelinesInstallation of technological equipment
«L’Oreal»Vil. Vorsino, Russia

2013

Installation of technological service platformsPiping of technological equipment and tanks

 

OJSC «ЕGМZ № 1»c.Yekaterinburg Sverdlovsk region, Russia

 

 

2013

Installation of Tetra Pack lineUpgrading of Tetra Pack line
PJSC «Efes Ukraine» c.Donetsk, Ukraine

2014

Installation of technological service platformsInstallation of pipelinesInstallation of technological equipment
«Pologi chemical factory «Coagulant»c.Pologi, Ukraine

2014

Manufacturing of technological equipment set for  processing of clay and similar materials